ID. Buzz(((ID. Buzz Pro – Power consumption in kWh/100 km: combined 18.9 (NEDC); combined 21.7–20.6 (WLTP); CO₂ emissions combined in g/km: 0; efficiency class: A+++.))): Production start at German component locations

ID. Buzz(((ID. Buzz Pro – Power consumption in kWh/100 km: combined 18.9 (NEDC); combined 21.7–20.6 (WLTP); CO₂ emissions combined in g/km: 0; efficiency class: A+++.))): Production start at German component locations

ID. Buzz(((ID. Buzz Pro - Power consumption in kWh/100 km: combined 18.9 (NEDC); combined 21.7–20.6 (WLTP); CO₂ emissions combined in g/km: 0; efficiency class: A+++.))): Production start at German component locations

Following the production start of the ID. Buzz, German component locations have begun to produce key technology components for the new e-model. Plants in Braunschweig, Kassel, Salzgitter and Hannover are now supplying the battery system, the electric drive and the chassis. It’s the next step in a transformation process initiated in 2015 that is converting the company into an e-mobility system supplier. Volkswagen Group Components will invest €2.3 billion in the electrification of its German locations through 2026 – well more than half of overall investments.

Read on

ID. Buzz(((ID. Buzz Pro – Power consumption in kWh/100 km: combined 18.9 (NEDC); combined 21.7–20.6 (WLTP); CO₂ emissions combined in g/km: 0; efficiency class: A+++.))): Production start at German component locations

2022-06-17 14:03