GMがシボレー・ボルトEVの生産中断をさらに2週間延長

GMがシボレー・ボルトEVの生産中断をさらに2週間延長

 GMはミシガン州オリオン組立工場の閉鎖期間を2週間延長した。Chevrolet Bolt EVとBolt EUVのリコールにともなうバッテリーパックの不足が理由だ。 Read More

GMがシボレー・ボルトEVの生産中断をさらに2週間延長

2021-09-11 05:04

31 views

Same Tag Posts

  1. MIT’s soft robotic system is designed to pack groceries ()
  2. AI-powered scams and what you can do about them ()
  3. Identity.vc is bringing capital and community to Europe’s LGBTQ+ venture ecosystem ()
  4. Robot cats, dogs and birds are being deployed amid an ‘epidemic of loneliness’ ()
  5. Apple reportedly working to bring AI to the Vision Pro ()
  6. ServiceNow’s generative AI solutions are taking advantage of the data on its own platform ()
  7. Gemini’s data-analyzing abilities aren’t as good as Google claims ()
  8. The biggest data breaches in 2024: 1B stolen records and rising ()
  9. Apple finally supports RCS in iOS 18 update ()
  10. SAP, and Oracle, and IBM, oh my! ‘Cloud and AI’ drive legacy software firms to record valuations ()

Same Category Posts