QuantumScape and Volkswagen to select location for solid-state battery JV pilot-line facility; 1GWh to start

QuantumScape and Volkswagen to select location for solid-state battery JV pilot-line facility; 1GWh to start

Solid-state battery developer QuantumScape Corporation (earlier post) has entered into an agreement with Volkswagen Group of America, Inc. to select the location of their joint-venture solid-state battery pilot-line facility by the end of 2021. The companies currently contemplate Salzgitter, Germany for the location. The pilot-line facility, QS-1, will initially be…

QuantumScape and Volkswagen to select location for solid-state battery JV pilot-line facility; 1GWh to start

2021-05-17 05:04

61 views

Same Tag Posts

  1. Here’s What The Tesla Cybertruck’s Battery Passport Reveals ()
  2. This EV Prototype Can Charge To 80% In Under Five Minutes ()
  3. Toshiba’s Ultra-Fast Rechargeable SCiB Batteries Get 50% Capacity Boost ()
  4. Ford F-150 Lightning SuperTruck Only Has A 50-kWh Battery. Here’s Why That’s Enough ()
  5. NIO’s New Battery Swap Station 4.0 Is Faster, Bigger And Automatic ()
  6. Massive Expansion Of North American Battery Manufacturing Capacity Ahead ()
  7. BYD, CATL Working On LFP Batteries That Could Be Fully Recharged In 10 Minutes ()
  8. Average Tesla Model 3, Model Y Battery Degradation After 200,000 Miles Impresses ()
  9. The 2024 Chevy Equinox EV Tells Us A Lot About Why Voltage Matters ()
  10. Tesla Celebrates Building 50 Millionth 4680-Type Battery Cell At Giga Texas ()

Same Category Posts